â–º Listen Live

New detour route around Rio Grande Bridge construction

Drivers will need to start taking a new route around construction on the Rio Grande Bridge replacement. Starting Monday, Range Road 121 will close between Township Road 704 and the bridge.

Crews will be moving to the north side of the bridge to finish its realignment. People needing to get to the Rio Grande Sports Grounds can do so by heading north on Range Road 121 from Township Road 703. Range Road 121 is also closed to non-local traffic from Secondary Highway 722 to Township Road 703 for ongoing base paving work.

It’s expected this phase of the project will be done by the end of September. After that, paving work will be left, which could lead to more road and lane closures.

The full replacement is planned to be done this construction season. The budget is $6.7 million from the County of Grande Prairie.

Erica Fisher
Erica Fisherhttp://Erica
Content Manager/Afternoon Host
- Advertisement -

Related Articles

- Advertisement -

Latest News

Canada Post to resume limited service as CUPW shifts to rotating strikes Oct. 11

Canada Post says it will begin restarting mail operations this weekend as the Canadian Union of Postal Workers shifts from a national walkout to rotating strikes.

AHS warns of possible measles exposure at Grande Prairie Regional Hospital ED

A confirmed measles case has prompted an exposure warning in Grande Prairie.

City own facilities closed or running service hours on Thanksgiving

You can expect to see multiple different city facilities closed on Monday, October 13th for Thanksgiving.

City, county finalize Multisport Dome contribution agreement

Both the city and County of Grande Prairie have completed the City County Multisport Dome Capital Contribution Agreement.

County of Grande Prairie updates wildfire mitigation strategy

The County of Grande Prairie released an updated Wildfire Mitigation Strategy with hopes to reduce the risk of wildfires around the county.
- Advertisement -