Road work to start in Prairie Mall area

Road work along the bypass and near the Prairie Mall will start Monday. Crews will be in the VLA Montrose and Northgate areas throughout the rest of August and September.

Work will be done on 99 Street from 112 Avenue by Canadian Tire to 121 Avenue and 100 Street behind the Prairie Mall, as well as 116 Avenue from 100 Street east to the CN Rail crossing. Because those areas are so busy, most of the work will be done overnight from 7 p.m. to 8 a.m.

The city will be milling the existing road and paving the roads, as well as doing some curb and sidewalk repairs, storm sewer repairs, repainting lines and landscaping. The speed limit in the construction zones will be down to 30 kilometres an hour and drivers are asked to take an alternate route if possible.

Erica Fisher
Erica Fisherhttp://Erica
Content Manager/Afternoon Host

cjgy Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

6th annual Vista Radio sock drive accepting donations until Monday

Monday, Nov. 30 will be the last day for the 104.7 The GOAT and 96.3 Sun FM's 2026 Sock Drive.

GPPS searching for dashcam, surveillance footage in connection to possible gunshot

The Grande Prairie Police Service is looking to the public for any information about a potential incident involving a possible gunshot. 

KLon Services purchases iconic Clairmont Ice Cream Barn

KLon Services is in for a real treat, after purchasing the former Clairmont Ice Cream Barn.

Peace River RCMP advising of icy conditions throughout Peace Region

The Peace River RCMP are advising motorists that roads throughout the Peace Region are in extremely icy conditions due to the freezing rain.

Multiple collision reported as freezing rain blankets region

 The Grande Prairie Police Service is urging drivers to slow down and drive to the conditions after multiple collisions Thursday morning.
- Advertisement -